C-17 |
ERMA FIRST ESK Engineering Solutions S.A.

ERMA FIRST, supported by EPE (www.epe.gr), a company that has more than 45 years of experience in marine environment protection equipment production, understands the needs of the vessel and provides with a future-proof system. Having installed more than 6,500 systems together with EPE,
the Team of ERMA FIRST has accumulated about 120 man-years of installing, commissioning, and supporting marine equipment.
ERMA FIRST FIT BTWS incorporates the most reliable and efficient filtration followed by a state-of-the-art disinfection stage. Filtration takes place in 40 microns automatic backwashing filters. The disinfection stage takes place in our own-design, highly customized electrodes, providing the appropriate amount of disinfectant agent by using minimum power and ensuring compliance.
NO IMAGE

ERMA FIRST FIT BWTS

ERMA FIRST FIT BWTS incorporates the most reliable and efficient filtration followed by a state-of-the-art disinfection stage.

NO IMAGE

ERMA FIRST BLUE CONNECT

ERMA FIRST BLUE CONNECT is a Shore Power containerized system designed for high voltage shore - connection according to IEC 8005 Standards. Shore power system is used to enable the vessel to shut down the auxiliary engines during port stay. Therefore, power demand for vessel’s operation is provided through the shore connection directly from mainland’s power grid.

Corporate information

Address GREECE
TEL +30-21-0409-3000
URL http://www.ermafirst.com/

Contact in Japan

Japan Agent CBSI K.K.
Address 2-27-2 Sumiyoshi-cho, Naka-ku, Yokohama
TEL +81-45-650-2360

Sharing Stand Exhibitors

  • CBSI(JAPAN)
Page Top